5.8.1 Mooney Lake Emergency Pumping

ProjectMooney Lake Emergency Pumping
DescriptionConstruction of an emergency outlet pumping system for Mooney Lake
NeedMooney Lake does not have a natural outlet, and water levels periodically rise to flooding levels. A 2003 Feasibility Study identified several options for adding emergency pumping infrastructure. The recommended option was the “South Intake Route to 18th Avenue.”
OutcomeReduction in length of high water periods, reduction in flooding, reduction in property losses
Estimated Cost and FundingFinal design, permitting, construction, project management. Source of funding is the District capital levy.$125,000
Schedule

2007 Design, permitting, construction

2015 Diagnostic study, design, easement acquisition

2016 Construction