5.8.1 Schutz Lake Wetland Detention Pond

ProjectConstruction of a stormwater treatment pond to treat runoff to Schutz Lake
DescriptionThe phosphorus reduction plan for Schutz Lake requires a reduction of 124 pounds of phosphorus per year from the subwatershed. A wet detention pond is proposed for consideration at the outlet of SL-2 (see Figure 20), which drains subwatersheds SL-1 and SL-2. This pond would be designed to remove at least half the phosphorus load projected to be contributed by those drainage areas under the ultimate development conditions.
OutcomeThis pond could remove an estimated 56 pounds of phosphorus annually, along with other pollutants such as sediment.
Estimated Cost
Design, easement acquisition,
construction, and project management.
Funding source is the District capital levy.
$ 126,500 Design, ROW
$ 1,002,100 Construction
$ 1,128,600 Total
Schedule 

2013 Design, easement acquisition

2014 Construction