Watertown Township

Erosion Control:

  • Exposing 5,000 square feet of soil
  • Grading, excavating, filling, or on-site storing of 50 cubic yards of soil

Floodplain Alteration:

Wetland Protection:

  • Draining, filling, or excavating of a wetland
  • Any project that already requires a permit under the Stormwater Management or Waterbody Crossings & Structures rule, if there is a wetland on the property
  • Building on undeveloped lots or tear down/rebuild projects that increases the amount of hard surface

Dredging:

  • Dredging in the beds, banks, or shores of any public water, basin, or watercourse

Shoreline and Streambank Stabilization:

Waterbody Crossings & Structures:

  • Placing or replacing roads, highways, utilities or other structures in contact with the bed or bank of any water body
  • Building a bridge or related crossing of any water body
  • Enclosing a water body within a pipe
  • Directional boring underneath a waterbody